
ISO 9001:2015
Certified by BRE Global, accredited by UKAS
An audited quality management system. It means the way a job is planned, recorded and signed off is itself inspected by somebody independent, on a schedule.
A sprinkler system is designed against a hazard classification, not against a floor area. That classification comes from what the building is used for and what is kept in it, and it decides how much water the system must deliver, for how long, and what has to sit behind it. Below is what each kind of building carries, and the thing that most often goes wrong in it.
Classifications are from Annex A of BS EN 12845, which is normative. Its tables are minimums, which is why each one reads "at least": a designer assigns the real class from the actual building, and storage on site routinely pushes it higher.
Nobody here can simply be asked to leave, so isolation is planned around the building rather than the other way round.
What is stored decides the class, and what is stored changes without anybody telling the sprinkler system.
Hundreds of people in one place at once, so evacuation is by the crowd. And a cinema carries the highest ordinary classification in the standard.
Two things surprise people here. A cinema sits at the top of the ordinary range, three groups above a hospital. And food production is not one answer at all: it spans three groups depending on what comes off the line.
| Building | Classification | Standard |
|---|---|---|
| Warehouses and distribution | OH1 to OH4, or High Hazard for storage | BS EN 12845 · LPC Rules |
| Blocks of flats | BS 9251, residential | BS 9251 · BS EN 12845 · BS 9990 |
| Care homes | BS 9251, residential | BS 9251 · BS EN 12845 |
| Schools and colleges | At least OH1 | DfE Technical Manual · BS EN 12845 · BS 9251 |
| Offices | Light Hazard, or at least OH1 | BS EN 12845 · BS 9990 |
| Museums and galleries | At least OH2 | BS EN 12845 |
| Cinemas and theatres | At least OH4 | BS EN 12845 |
| Hospitals and healthcare | At least OH1 | BS EN 12845 · HTM 05-02 |
| Cancer treatment centres | At least OH1, with specialist rooms | BS EN 12845 · HTM 05-02 |
| Food processing | OH1 to OH3, by product | BS EN 12845 · LPC Rules |
| Shopping centres | At least OH3 | BS EN 12845 · BS 9990 |
Not on the list? The classification tables are also used as guidance for occupancies they do not name, so a building type that is not here still resolves to one of these. Tell us what it is and we will tell you which.
Two certifications, and the first one is the reason we could apply for the second. ISO 9001 is a precondition for LPCB approval, so this is a sequence rather than a collection.

Certified by BRE Global, accredited by UKAS
An audited quality management system. It means the way a job is planned, recorded and signed off is itself inspected by somebody independent, on a schedule.

Loss Prevention Certification Board
The approval UK insurers look for on sprinkler work. A system installed by an LPCB approved contractor counts as genuine risk mitigation on your policy; one installed by anybody else may not.
Working to BS EN 12845, BS 9251 and BS 9990. If your insurer or fire risk assessor wants the certificates themselves, ring us and we will send them over.
No survey fee to find out where you stand. Describe the site and we will tell you which intervals apply and what the visit involves.
Hello. Tell us what the building needs and roughly where it is, and we will come back with a price and a date.
SentryWe would like to measure how people find and use this site. That needs analytics cookies, and only if you say yes. Nothing is stored on your device until you choose, and you can change your mind at any time. Read the cookie policy.
Remembers the choice you make here so we do not ask again on every page. Nothing else. This cannot be switched off, because switching it off is what it records.
Which pages get read, which searches bring people here, and where people give up. Aggregated, never used to identify you, and never shared with advertisers.