What does a fire sprinkler system actually cost?

There is no honest single answer, and anybody publishing one has not seen your building. What decides it is what is installed, what the water supply has to do, and how hard the plant is to reach. This page is the whole list, so you can read a quotation properly and tell whether two of them are pricing the same job.

  • 0figures published, on purpose
  • 6checks that make two quotes comparable
  • 30days our written price holds for

Which of these are you pricing?

Four different jobs get called "sprinkler quotes" and they behave nothing alike. Pick the one you are actually buying.

The largest number, and the one with the widest spread, because it is driven by what the building is rather than by how big it is.

  1. 01 Hazard classification Light, Ordinary 1 to 4 or High Hazard under BS EN 12845. It sets the design density and therefore the size of every pipe, tank and pump downstream. A change of one class can move the whole scheme.
  2. 02 The water supply A town main that can already deliver the flow and pressure is the cheapest outcome by a long way. A stored tank and a pump set is a plant room, a foundation, a power supply and an annual test regime for the life of the building.
  3. 03 Storage height and racking In a warehouse this decides whether roof-level heads are enough, or whether the racking needs sprinklers inside it, which is a different job entirely.
  4. 04 The building fabric Exposed steel deck is quick. Suspended ceilings, listed fabric, occupied floors and anything needing concealed pipework and flush heads are not.
  5. 05 Phasing and access The same system installed in one empty shell and installed floor by floor around a working tenant are two different prices, and the second one is not a small uplift.

Ask for this. Ask for the hazard class the design assumes, and the water supply arrangement, in writing. Those two decide most of it and they are the two most often left vague.

Six checks before you compare two totals

Nearly every gap between two quotations in this trade is explained by one of these, and none of them requires you to know anything about sprinklers.

  1. Does it name the standard?

    BS EN 12845 for sprinklers, BS 9990 for risers. A quotation that names neither is not a compliance quotation, whatever it costs.

  2. Does it list the intervals?

    Weekly, monthly, quarterly, half-yearly and annual for sprinklers. Six-monthly and annual for risers. One annual visit priced against a standard that requires five routines is a different product.

  3. Flow test or start test?

    On anything with a pump. They are not interchangeable and the gap between them is most of the difference between two pump prices.

  4. Who does the weekly checks?

    Under BS EN 12845 they sit with the responsible person unless contracted out. A cheaper quotation may simply have left them with you.

  5. Is remedial work separate?

    Nobody knows what a first service will find. An honest contract prices the service and prices repairs when they are found, rather than burying an allowance in the figure.

  6. What is excluded?

    Making good, access equipment, permits, out-of-hours premiums and builder work. Exclusions belong in the quotation, not in the invoice.

Why we publish no price list

Two warehouses of the same floor area, on the same estate, can differ by a factor of three. One has a single control valve set inside the door and a pump in a house you can drive to. The other has three valve sets, a diesel set in a basement behind a two-metre access hatch, and racking that has to be moved to reach the flow switches.

A figure produced before anyone has seen that is a figure you will build a budget around, and we will have to revise. A revised price reads as a rise however honest the reason. So the survey comes first, it is free, and the number that follows it is fixed and in writing.

If you want the detail behind the recurring side of it, that is the seven things that drive a servicing contract, and the regime it is priced against is BS EN 12845 in plain English.

Three sprinkler control valve sets installed on a plant room wall
Electric fire pump set and jockey pump in a plant room
Sprinkler main being run out across a warehouse
Prefabricated sprinkler pipework and brackets laid out ready to install

What you get instead of a guess

  1. 01

    A free survey

    An engineer, not a salesperson, walks the plant room and counts what is actually there rather than what the drawings say.

  2. 02

    A fixed price in writing

    Itemised, naming the standard and the intervals, with remedial work priced separately rather than buried in the figure.

  3. 03

    Thirty days to decide

    The price holds. No pressure afterwards, and if the answer is that you do not need what you thought you needed, that is what the survey will say.

Book the survey No fee, no obligation, and it takes about an hour on most buildings.

Questions about cost

Why does this page not give a price?

Because the two things that decide most of it, what is actually installed and how hard it is to reach, cannot be established from a postcode. A figure published here would be wrong often enough to be a liability, and you would plan around it. We survey instead, free of charge, and put a fixed figure in writing afterwards.

What is the most expensive part of a new sprinkler installation?

Usually the water supply. Where the incoming main can already deliver the design flow and pressure, the job is pipework and heads. Where it cannot, the scheme gains a stored water tank, a pump set, a plant room to put them in, a power supply and an annual test regime for the life of the building.

Does a sprinkler system reduce insurance premiums?

Often, and sometimes it decides whether cover is offered at all. Insurers treat a system as genuine risk mitigation only where an approved contractor installed it and it is maintained on a documented regime, so an unapproved installation or a gap in the records can lose the benefit the system was fitted for.

Is it cheaper to put several buildings on one contract?

Per site, yes, and noticeably so. Travel is shared, visits are planned into routes and the reporting is consolidated. If you look after more than a handful of buildings, say so at the first conversation rather than after the first quotation.

Can a price be agreed for more than one year?

The servicing can, on a multi-year contract, and that is normal on a portfolio. What cannot be fixed in advance is remedial work, because nobody knows what a first service will find on a system that has not been looked at properly. An honest contract prices the two separately rather than carrying a contingency inside the service figure.

Where the figures on this page come from

What a system costs is driven by what these documents require of it: the hazard class, the water supply and the design density all come from here, not from us.

British Standards are copyright documents and most are bought rather than read free. We hold the ones we work to. If you need to know what one of them says about your building, ask us rather than buying it.

Approved, and audited on a schedule.

Two certifications, and the first one is the reason we could apply for the second. ISO 9001 is a precondition for LPCB approval, so this is a sequence rather than a collection.

BRE Global Certification and UKAS Management Systems 0007

ISO 9001:2015

Certified by BRE Global, accredited by UKAS

An audited quality management system. It means the way a job is planned, recorded and signed off is itself inspected by somebody independent, on a schedule.

LPCB, Loss Prevention Certification Board

LPCB approved

Loss Prevention Certification Board

The approval UK insurers look for on sprinkler work. A system installed by an LPCB approved contractor counts as genuine risk mitigation on your policy; one installed by anybody else may not.

Working to BS EN 12845, BS 9251 and BS 9990. If your insurer or fire risk assessor wants the certificates themselves, ring us and we will send them over.

Tell us the building. We will tell you what it is due.

No survey fee to find out where you stand. Describe the site and we will tell you which intervals apply and what the visit involves.

Based
37 Dickens Drive, Kettering, NN16 9EG
Covering
Kettering · Corby · Wellingborough · Northampton · Rushden · Daventry · Market Harborough · Bedford and England, from our base in Kettering
Office hours
Monday to Friday, 7am to 5pm. Emergency line any hour.

What do you need?
    Who do we come back to?

    If it is urgent, ring rather than write. We are on the phone Monday to Friday, 7am to 5pm, and outside those hours the same number reaches the emergency line.

    Or send it straight to us

    Or just ring 07927 555475 and talk it through. Mon to Fri, 7am to 5pm. Emergencies any hour.