Sprinkler systems for blocks of flats

A new block above 11 metres, a fire risk assessment that flagged the system, or a managing agent taking over a building with no records.

  • ISO 9001 and LPCB approved, the certification insurers look for
  • BS 9251 · BS EN 12845 · BS 9990
  • Free survey, fixed price in writing, no travel charge

What is different about blocks of flats

Since 2020, Approved Document B has required sprinklers in new blocks of flats where the topmost storey is more than 11 metres above ground level. That threshold came down from 30 metres, and it is the single biggest change in UK sprinkler regulation this century. What it created is a large number of buildings with a system, and a much smaller number with a complete record for it.

  • Residential systems are their own standard

    BS 9251 covers residential and domestic sprinklers, and it is not BS EN 12845 with different heads. The design assumptions, the water supply and the maintenance regime are different, and a contractor who works to the commercial standard by habit will get it wrong.

  • The records belong to the building

    Commissioning documentation, as-fitted drawings and the maintenance log stay with the block, not with whoever last held the contract. Getting them handed over is the part worth insisting on, and it is where a change of managing agent most often loses the thread.

  • Access to flats is the practical problem

    Anything inside a dwelling needs the resident to let you in, which means notice, a schedule and usually two attempts. We plan the communal work and the in-flat work as separate visits so one does not hold up the other.

  • Risers and sprinklers are separate duties

    A block over 18 metres owes a dry riser under BS 9990 as well, on its own testing interval. They are frequently held by different contractors and fall out of step, which is the gap a fire risk assessor finds.

This work, on our sites

See the full gallery

Blocks of flats: questions

Our block is just under 11 metres. Do we need sprinklers?

Not under Approved Document B as the building stands. That settles the question for today and very little else: a roof-level alteration, an added storey or a change of use can move a building across the threshold, and the requirement then applies to the work being done. The measurement is taken to the floor of the topmost storey rather than to the ridge, so it is worth knowing which side of it you are on by measurement rather than assumption.

We have taken over the block and there are no records at all. What now?

That is a normal starting point rather than an awkward one, and it is recoverable. A survey establishes what is actually installed and what condition it is in, and a set of as-installed drawings can be produced from the system as it stands. It costs something once, and every handover after that is straightforward.

Do residents have to let you into their flats?

For anything inside a dwelling, yes, and that is the part that needs planning rather than the engineering. We give notice, work to a schedule and expect to make a second visit for the flats nobody was in for. The communal areas are done separately so the whole programme does not stall on one door.

Who is legally responsible, the freeholder or the managing agent?

The responsible person under the Fire Safety Order is whoever controls the premises, which in practice is usually the freeholder, with the managing agent acting for them. The duty can be delegated as work but not as responsibility, which is why the certificate and the record matter as much as the visit.

The published documents behind this page

Every interval and threshold on this page comes from one of these. Links go to the publisher, not to a copy of the document.

British Standards are copyright documents and most are bought rather than read free. We hold the ones we work to. If you need to know what one of them says about your building, ask us rather than buying it.

Approved, and audited on a schedule.

Two certifications, and the first one is the reason we could apply for the second. ISO 9001 is a precondition for LPCB approval, so this is a sequence rather than a collection.

BRE Global Certification and UKAS Management Systems 0007

ISO 9001:2015

Certified by BRE Global, accredited by UKAS

An audited quality management system. It means the way a job is planned, recorded and signed off is itself inspected by somebody independent, on a schedule.

LPCB, Loss Prevention Certification Board

LPCB approved

Loss Prevention Certification Board

The approval UK insurers look for on sprinkler work. A system installed by an LPCB approved contractor counts as genuine risk mitigation on your policy; one installed by anybody else may not.

Working to BS EN 12845, BS 9251 and BS 9990. If your insurer or fire risk assessor wants the certificates themselves, ring us and we will send them over.

Tell us the building. We will tell you what it is due.

No survey fee to find out where you stand. Describe the site and we will tell you which intervals apply and what the visit involves.

Based
37 Dickens Drive, Kettering, NN16 9EG
Covering
Kettering · Corby · Wellingborough · Northampton · Rushden · Daventry · Market Harborough · Bedford and England, from our base in Kettering
Office hours
Monday to Friday, 7am to 5pm. Emergency line any hour.

What do you need?
    Who do we come back to?

    If it is urgent, ring rather than write. We are on the phone Monday to Friday, 7am to 5pm, and outside those hours the same number reaches the emergency line.

    Or send it straight to us

    Or just ring 07927 555475 and talk it through. Mon to Fri, 7am to 5pm. Emergencies any hour.