Dry riser installation is needed in new buildings, conversions and extensions where a floor sits more than 18 metres above fire service access, and wherever the fire strategy calls for one. We install the riser main, the inlet at ground level, a landing valve on each floor and the air valve at the top, then test it to 12 bar and hand over the certificate. Sentry Sprinkler Protection does this work across England from its base in Kettering, ISO 9001 certified.

When a building needs a dry riser

Under Approved Document B, a building with a floor more than 18 metres above fire service vehicle access needs a fire main. Up to 50 metres that is usually a dry riser. Above that it is a wet riser, because a brigade pump cannot reach the height.

A conversion that adds storeys can cross the threshold without anyone noticing until building control asks.

What the installation includes

  • The riser main, routed through the building alongside the other services.
  • A breeching inlet in a signed, lockable cabinet at ground level.
  • A landing valve on each floor, in a cabinet or lobby as the design requires.
  • An air valve at the top and a drain at the base, so the riser empties after use.
New dry riser pipework run through a service void, installed and awaiting completion

Working with the main contractor

On a new build the riser goes in with the structure and the other trades. We need a fixed layout and three to four weeks of notice to arrange materials and access, and the programme goes in the quotation.

Testing and handover

Before handover the riser is charged to 12 bar and held for 15 minutes, every landing valve is checked, and the inlet is proved. You get the certificate building control and your fire risk assessor will ask for.

From then on it needs a six-monthly inspection and an annual test under BS 9990, which we can take on as well.

Two locked stainless steel dry riser inlet cabinets with red signage

From first call to certificate

Four steps, the same on every job.

  1. A sprinkler layout drawing marked up on site during a survey
    01

    Free survey

    We look at the building and its records, and tell you what it is due.

  2. A sprinkler installation drawing open on a laptop on site
    02

    Fixed price in writing

    Every item priced line by line. No survey fee, nothing added afterwards.

  3. An engineer installing sprinkler pipework from a scissor lift
    03

    The work, on your dates

    Isolation agreed before anyone arrives, kept as short as the job takes.

  4. A bank of sprinkler alarm valve sets with gauges in a plant room
    04

    Certificate and record

    A certificate and a photographed defect list, ready for your insurer.

  5. Start

    Book the free survey

    Tell us the building. We will tell you what it is due.

    Book a free survey

Free survey · fixed price in writing

Tell us what you need. We will tell you what it takes.

Four quick taps and your details. A free survey and a fixed price in writing, with no survey fee and no obligation.

Call 07927 555475

Mon to Fri, 7am to 5pm. Emergencies any hour.

What do you need?

Pick one. The next questions follow from it.

What kind of building is it?
How tall is the building?
What is happening?
Which part needs looking at?
Where is the project?
When is it due?
How soon do you need us?
Who do we ring back?

Usually the same working day. We never share your details.

No survey fee, no obligation. ISO 9001:2015 certified.

Questions about dry riser installation

As a dry riser installer, do you install wet risers too?

Yes. A wet riser adds a pump set, a break tank and alarms to the pipework, and we install and maintain both types.

Can a dry riser be added to an existing building?

Yes, where the building has changed or the fire strategy calls for one. The route through an occupied building is the main design question, and we look at it at the survey.

How long does a dry riser installation take?

It depends on the number of floors and the access, because each floor has its own landing valve and checks. The programme is set out in the quotation.